April 27, 2016
Given that LDC 1.0.0 will go with the 2.070.2 front end, I am assuming that a switch to the 2.071 front end will be LDC 1.1. Whilst it is right and proper to focus more on getting 1.0.0 out of the door in a good state, might it be wise to set expectations now about timing and numbering of keeping up with DMD frontend versions?

Clearly there are two conflicting tensions here:

1. Once 1.0.0 is out of the door, it will define D for years, and act as an anchor against change.

2. There is always a bleeding edge group who will demand LDC is always up to date with DMD front end (people like me :-)

Balancing these is always hard, but worth doing. Setting expectations as part of the 1.0.0 release cycle strikes me as a good idea.


PS I can confirm that the 2.071 branch is working fine for me.

-- 
Russel. ============================================================================= Dr Russel Winder      t: +44 20 7585 2200   voip: sip:russel.winder@ekiga.net 41 Buckmaster Road    m: +44 7770 465 077   xmpp: russel@winder.org.uk London SW11 1EN, UK   w: www.russel.org.uk  skype: russel_winder